
Posted by KALEEM MUHAMMAD ASSUMING THAT EVERYTHING IS RIGHT, IF I HAVE AFLAT STOCK OF 20" X 5'LONG HANGED ON A LOAD BAR VERTICALLAY WHICH IS 2' APART, HOW MUCH TIME A PAINTER WILL TAKE TO SPRAY OR WHAT SPEED SHOULD IT RUN AT SO PAINTER CAN OAINT IT WITHOUT ANY PROBLEM ( I NOTICE ALL THE TIME THAT THE PAINTERS ARE UNABLE TO MAKE-UP AND WE ALWAYS HAVE POOR HIDING PROBLEMS. THANKS FOR THE HELP KALEEM
![]()
on 4/2/2006, 8:18 pm
206.172.37.66
I AM TRYING TO ESTABLISH SOME STANDARD OPERATING PROCEDURES FOR MANUAL POWDER COATING AND WANTED TO KNOW WHAT IS THE STANDARD RULES TO DETERMINE EITHER THE LINE SPEED REQUIREMENT OR NO. OF SPRAYERS REQUIRED TO PAINT AT CERTAIN SPEED
Message Thread:
![]()
« Back to thread