I'm a meteorology nerd. Don't ask me any physics questions though, I'll just give you a blank stare
Previous Message
Pyramid repair was pending a 2nd engineering and architect report which was expected in summer of 2023. Summer ends on Sept 21st so the report should be in house by now. Haven't heard anything recently. Maybe we're hoping for a dry winter with no roof leaks. Previous Message
Good to see the addition of more student housing. Anyone know the details of the Walter Pyramid Renovation? Previous Message
Lots of improvements on buildings including the mid:
https://la.urbanize.city/post/new-master-plan-cal-state-long-beach-could-add-1600-student-beds
Message Thread
« Back to index