The crews ran into some difficulty isolating the line and as a last option all the water supply had to be shut off.
They are currently installing the new valve and water should be on soon.
Part of the delay was not being able to shut off the flow from the storage tanks which resulted in a constant flooding of the hole they are working in.
I do apologize for the extended outage and they are working as fast as they can to get it back on.
Eric Moeller
Responses
« Back to index | View thread »